Load planning
Plan for present and future loads. Lighting, fans, AC, computers and small appliances add up. A 10x10 office with AC typically needs a 3–5 kW connection; a larger multi-room cabin can require significantly more.
Earthing and safety
Proper earthing is essential — especially in industrial and mining environments. Confirm the earthing arrangement with your electrical contractor and ensure it is inspected before handover.
Need a portable cabin?
Manufactured in Rourkela, Odisha.
1 Year Warranty. 7–15 days delivery. Tell us the size, quantity and location.
